* she had toast and cereal for breakfast, breakfast was 8AM (their time)
* she had cheese sandwich for lunch
* she had chicken curry for tea
* today they caught a bus and went to a very, very big mountain. To get to the top they had to use chair lifts. She said it was "very high"
* she has fallen over lots and has bruises around her ankles and knees!
* she took her ski jacket today because it would be cold at the top of the tall mountain, she said it was minus 8 degrees!
* It snowed today and they got back just after 4PM (their time)
* when they got back they went to a spa. There was an indoor pool, an outdoor pool and a lazy river. She went in all three and they were all warm. The lazy river had jets of water that pushed you around.
* they had a very late tea at 10.30PM (their time). She had chicken curry. They were late having tea as they had been to the spa.
* she was very tired and was going to bed
TEXT AT 10.05PM (our time) - to say good night xx
02.01.17 - size gauge square made - 4mm hook
03.01.17 - 2 Star Sttich squares made (week 2 squares) - 5 mm hook
04.01.17 - 2 Star Stitch squares made (week 2 squares) - 5mm hook
1 popcorn square made (week 1 square) - 4mm hook
05.01.17 - 3 popcorn squares (week 1) - 4mm hook
06.01.17 - 1 bobble stitch square (week 3) - 4mm hook
1 corner to corner square (week 6) - 4mm hook
07.01.17 - 1 corner to corner square (week 6) - 4mm hook
08.01.17 - 2 corner to corner squares (week 6) - 4mm hook
09.01.17 - 3 bobble stitch squares (week 3) - 4mm hook
10.01.17 - 3 wave squares (week 4) - 4mm hook
11.01.17 - 1 wave square (week 4) - 4mm hook
12.01.17 - 2 seagull stitch squares (week 5) - 3.5mm hook
13.01.17 - 2 seagull stitch squares (week 5) 3.5mm hook
1 heart bobble square - (week 7) - 4mm hook
14.01.17 - 1 heart bobble square - (week 7) - 4mm hook
15.01.17 - 2 heart bobbles squares (week 7) - 4mm hook
16.01.17 4 waffle stitch squares (week 8) - 4.5mm hook
2 cable stitch squares (week 9) - 3.5mm hook
17.01.17 - 2 cable stitch squares (week 9) - 3.5mm hook
18.01.17 - 2 week 10 squares - 4mm hook
19.01.17 - 2 week 10 squares - 4 mm hook
20.01.17 - 1 week 12 square - 4.5mm hook
23.01.17 - 2 week 12 squares done (4.5mm hook)
24.01.17 - 1 week 12 square done (4.5 mm hook)
- 1 week 10 square done (4mm hook)
45 squares done - 3 squares still to do - 48 squares in total
Todays lightbox.................